PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Preparation of Tender Documents for The New Reinforced Concrete Access Bridge
PROJECT LOCATION:
Kissy – Dockyard
Freetown, Sierra Leone
NAME OF CLIENT:
ORYX Energies Limited & Pettro-Jetty Limited
PROJECT DURATION:
June 2015 – December 2016
PROJECT COST:
USD. 1, 200, 000.00
PROJECT DESCRIPTION:
In the year 2015, ORYX Energies consulted ESM Consulting Engineers Co. Ltd Tanzania to perform a Full Detailed Engineering Design and Prepare Tender Documents, Engineering Drawings and Project Estimates, for the proposed Reinforced Concrete Access Bridge which will assist in the Transportation of Petroleum Products and Bio-Ethanol from the Existing Jetty located along the sea shores of Freetown in Sierra Leone. The project was awarded after Oryx Energies decided to do Major Expansion in Oil and Gas Exploration, Extraction, Sales and Distribution all over the World.
The assignment was accompanied by the following Project Activities:
• Detailed Load Analysis
• Detailed Stress Analysis
• Detailed Design of Reinforced Concrete Bridge
• Preparation of Detailed Engineering Drawings for construction of Reinforced Concrete Bridge
• Preparation of Detailed Cost Breakdown for The Construction of Reinforced Concrete Bridge
In this assignment, Geophysical Survey was the Initial Stage involved in the Project Feasibility Studies, which was found to be very crucial for this type of the project. This was conducted to provide Essential Geology parameters which are very useful in the Structural Design of Foundation Stability of The Access Bridge related to the Soil Parameters provided from the Laboratory Test Results of the extracted from the allocated Site Soil Sub-Layers.
SCOPE OF WORK:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Preparation of Tender Documents


PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Preparation of Tender Documents for Reinforced Concrete T-Girder Bridge.
PROJECT LOCATION:
Kissy – Dockyard
Freetown, Sierra Leone
NAME OF CLIENT:
ORYX Energies Limited & Pettro-Jetty Limited
PROJECT DURATION:
June 2015 – December 2016
PROJECT COST:
USD. 1, 200, 000.00
PROJECT DESCRIPTION:
In the year 2015, ORYX Energies consulted ESM Consulting Engineers Co. Ltd Tanzania to perform a Full Detailed Engineering Design and Prepare Tender Documents, Engineering Drawings and Project Estimates, for the proposed Reinforced Concrete Access Bridge which will assist in the Transportation of Petroleum Products and Bio-Ethanol from the Existing Jetty located along the sea shores of Freetown in Sierra Leone. The project was awarded after Oryx Energies decided to do Major Expansion in Oil and Gas Exploration, Extraction, Sales and Distribution all over the World.
The assignment was accompanied by the following Project Activities:
• Detailed Load Analysis
• Detailed Stress Analysis
• Detailed Design of Reinforced Concrete Bridge
• Preparation of Detailed Engineering Drawings for construction of Reinforced Concrete Bridge
• Preparation of Detailed Cost Breakdown for The Construction of Reinforced Concrete Bridge
In this assignment, Geophysical Survey was the Initial Stage involved in the Project Feasibility Studies, which was found to be very crucial for this type of the project. This was conducted to provide Essential Geology parameters which are very useful in the Structural Design of Foundation Stability of The Access Bridge related to the Soil Parameters provided from the Laboratory Test Results of the extracted from the allocated Site Soil Sub-Layers.
SCOPE OF WORK:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Preparation of Tender Documents


PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring of New Aviation Facilities
PROJECT LOCATION:
Julius Nyerere International Airport Terminal – 1
Dar Es Salaam, Tanzania
NAME OF CLIENT:
Everett Aviation East Africa Company Limited
PROJECT DURATION:
January 2014 – June 2016
PROJECT COST:
USD. 3, 500, 000.00
PROJECT DESCRIPTION:
In the year 2014, Everett Aviation East Africa Co. Ltd, after making a thorough Business Plan for establishment of Private Air Strips and Aviation Facilities in order to provide Private Flights, Emergency Flights and Flights Rescue Missions in the Coast Regions and in the Mainland Areas, appointed ESM Consulting Engineers Co. Ltd to be the main Civil and Structures Consulting Engineers who will be responsible in providing Detailed Engineering Design and Preparation of Tender Documents of New Aircraft Aviation Facilities briefly listed below:
• Two Storey Reinforced Concrete Office Building
• Two Storey Reinforced Concrete Lounge Building
• Reinforced Concrete Panels for Aircraft Parking Area
• Reinforced Concrete Panels for Aircraft Aprons
• Reinforced Concrete Panels for Aircraft Taxi Ways
• Reinforced Concrete Access Bridge for Everette Aircrafts
• Structural Steel Aircraft Hanger
SCOPE OF WORK:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Tender Management
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material


PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring of New Aviation Facilities
PROJECT LOCATION:
Julius Nyerere International Airport Terminal – 1
Dar Es Salaam, Tanzania
NAME OF CLIENT:
Everett Aviation East Africa Company Limited
PROJECT DURATION:
January 2014 – June 2016
PROJECT COST:
USD. 3, 500, 000.00
PROJECT DESCRIPTION:
In the year 2014, Everett Aviation East Africa Co. Ltd, after making a thorough Business Plan for establishment of Private Air Strips and Aviation Facilities in order to provide Private Flights, Emergency Flights and Flights Rescue Missions in the Coast Regions and in the Mainland Areas, appointed ESM Consulting Engineers Co. Ltd to be the main Civil and Structures Consulting Engineers who will be responsible in providing Detailed Engineering Design and Preparation of Tender Documents of New Aircraft Aviation Facilities briefly listed below:
• Two Storey Reinforced Concrete Office Building
• Two Storey Reinforced Concrete Lounge Building
• Reinforced Concrete Panels for Aircraft Parking Area
• Reinforced Concrete Panels for Aircraft Aprons
• Reinforced Concrete Panels for Aircraft Taxi Ways
• Reinforced Concrete Access Bridge for Everette Aircrafts
• Structural Steel Aircraft Hanger
SCOPE OF WORK:
• Feasibility Study
• Preliminary Design
• Detailed Design
• Tender Management
• Site Construction Works Monitoring
• Quality Control of Site Works and Construction Material


PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring of 33.0 Km Road to Gravel Standard
PROJECT LOCATION:
Coal Mining – Kitai Stockpile
Songea, Tanzania
NAME OF CLIENT:
TANCOAL Energy Company Limited
PROJECT DURATION:
January 2014 – December 2015
PROJECT COST:
USD. 36, 000, 000.00
PROJECT DESCRIPTION:
In the year 2014 TANCOAL Energy Co. Ltd in Association with POWER Group Co. Ltd appointed ESM Consulting Engineers Co. Ltd to be the main Civil and Structures Consulting Engineers who will be responsible in providing Full Design of 33.0 Km Gravel Road, for Transportation of Coal from the Mining Site to the Main Stockpile Area for the company, and prepare Full Engineering Design Calculations, Detailed Drawings for Construction and Cost Estimates of the Proposed Project.
In this assignment ESM Consulting Engineers Co. Ltd was involved in the following project items:
• Conducting Detailed Feasibility Study of the project
• Coordinate and Supervise Geology Survey and Material Tests on Site and in Laboratory
• Assessment and Detailed Design of Hydrology behaviour and requirements of the project route
• Assessment and Detailed Design of Access Bridges and Storm Collection Structures Involved along the project route
• Detailed Design of Pavement and Material required based on Design Load
• Detailed Design of Road Alignment (Vertical and Horizontal Alignments) within the allocated Design Speed
• Preparation of Fills and Cuts established from Terrain Model Data Survey and Design Levels
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Conducting Route Survey
• Coordinate and Supervise Geology Survey
• Coordinate and Supervise Hydrology Survey
• Preliminary Design of Pavement and Associated Structural Pavement Materials
• Detailed Design of Pavement and Alignment
• Detailed Design of Rigid Pavement (Strength, Durability and Storm Discharge Efficiency)
• Preparation of Fills and Cuts established from Detailed Physical Site Survey
• Preparation of Engineering Specifications
• Preparation of Detailed Engineering Drawings for construction


PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring of 33.0 Km Gravel Road
PROJECT LOCATION:
Coal Mining – Kitai Stockpile
Songea, Tanzania
NAME OF CLIENT:
TANCOAL Energy Company Limited
PROJECT DURATION:
January 2014 – December 2015
PROJECT COST:
USD. 36, 000, 000.00
PROJECT DESCRIPTION:
In the year 2014 TANCOAL Energy Co. Ltd in Association with POWER Group Co. Ltd appointed ESM Consulting Engineers Co. Ltd to be the main Civil and Structures Consulting Engineers who will be responsible in providing Full Design of 33.0 Km Gravel Road, for Transportation of Coal from the Mining Site to the Main Stockpile Area for the company, and prepare Full Engineering Design Calculations, Detailed Drawings for Construction and Cost Estimates of the Proposed Project.
In this assignment ESM Consulting Engineers Co. Ltd was involved in the following project items:
• Conducting Detailed Feasibility Study of the project
• Coordinate and Supervise Geology Survey and Material Tests on Site and in Laboratory
• Assessment and Detailed Design of Hydrology behaviour and requirements of the project route
• Assessment and Detailed Design of Access Bridges and Storm Collection Structures Involved along the project route
• Detailed Design of Pavement and Material required based on Design Load
• Detailed Design of Road Alignment (Vertical and Horizontal Alignments) within the allocated Design Speed
• Preparation of Fills and Cuts established from Terrain Model Data Survey and Design Levels
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Conducting Route Survey
• Coordinate and Supervise Geology Survey
• Coordinate and Supervise Hydrology Survey
• Preliminary Design of Pavement and Associated Structural Pavement Materials
• Detailed Design of Pavement and Alignment
• Detailed Design of Rigid Pavement (Strength, Durability and Storm Discharge Efficiency)
• Preparation of Fills and Cuts established from Detailed Physical Site Survey
• Preparation of Engineering Specifications
• Preparation of Detailed Engineering Drawings for construction


PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring of 15.0 Km Road to Gravel Standard.
PROJECT LOCATION:
Madesa – Msata Bagamoyo
Pwani, Tanzania
NAME OF CLIENT:
Heritage Empire Company Limited
PROJECT DURATION:
June 2015 – June 2016
PROJECT COST:
USD. 16, 500, 000.00
PROJECT DESCRIPTION:
In the year 2015, Heritage Empire Company Limited appointed ESM Consulting Engineers Co. Ltd Tanzania to be the main Civil and Structures Consulting Engineers who will be responsible in providing Detailed Design of 15.0 Km of Gravel Road for The New Msata City Development, and prepare Full Engineering Design Calculations, Detailed Engineering Drawings and Specifications for Cost Estimates and Construction of the Proposed Project.
In this assignment ESM Consulting Engineers Co Ltd was involved in the following project items:
• Conducting Detailed Feasibility Study of the project
• Coordinate and Supervise Geology Survey and Material Tests on Site and in Laboratory
• Assessment and Detailed Design of Hydrology behaviour and requirements of the project route
• Assessment and Detailed Design of Access Bridges and Storm Collection Structures Involved along the project route
• Detailed Design of Pavement and Material required based on Design Load
• Detailed Design of Road Alignment (Vertical and Horizontal Alignments) within the allocated Design Speed
• Preparation of Fills and Cuts established from Terrain Model Data Survey and Design Levels
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Conducting Route Survey
• Coordinate and Supervise Geology Survey
• Coordinate and Supervise Hydrology Survey
• Preliminary Design of Pavement and Associated Structural Pavement Materials
• Detailed Design of Pavement and Alignment
• Detailed Design of Rigid Pavement (Strength, Durability and Storm Discharge Efficiency)
• Preparation of Fills and Cuts established from Detailed Physical Site Survey
• Preparation of Engineering Specifications
• Preparation of Detailed Engineering Drawings for construction


PROJECT NAME:
Consultancy Services for Detailed Engineering Design and Site Construction Works Monitoring of 15.0 Km Road to Gravel Standard.
PROJECT LOCATION:
Madesa – Msata Bagamoyo
Pwani, Tanzania
NAME OF CLIENT:
Heritage Empire Company Limited
PROJECT DURATION:
June 2015 – June 2016
PROJECT COST:
USD. 16, 500, 000.00
PROJECT DESCRIPTION:
In the year 2015, Heritage Empire Company Limited appointed ESM Consulting Engineers Co. Ltd Tanzania to be the main Civil and Structures Consulting Engineers who will be responsible in providing Detailed Design of 15.0 Km of Gravel Road for The New Msata City Development, and prepare Full Engineering Design Calculations, Detailed Engineering Drawings and Specifications for Cost Estimates and Construction of the Proposed Project.
In this assignment ESM Consulting Engineers Co Ltd was involved in the following project items:
• Conducting Detailed Feasibility Study of the project
• Coordinate and Supervise Geology Survey and Material Tests on Site and in Laboratory
• Assessment and Detailed Design of Hydrology behaviour and requirements of the project route
• Assessment and Detailed Design of Access Bridges and Storm Collection Structures Involved along the project route
• Detailed Design of Pavement and Material required based on Design Load
• Detailed Design of Road Alignment (Vertical and Horizontal Alignments) within the allocated Design Speed
• Preparation of Fills and Cuts established from Terrain Model Data Survey and Design Levels
SCOPE OF WORK:
In this assignment ESM Consulting Engineers Co. Ltd was involved in the scope of consultancy briefly described below:
• Conducting Route Survey
• Coordinate and Supervise Geology Survey
• Coordinate and Supervise Hydrology Survey
• Preliminary Design of Pavement and Associated Structural Pavement Materials
• Detailed Design of Pavement and Alignment
• Detailed Design of Rigid Pavement (Strength, Durability and Storm Discharge Efficiency)
• Preparation of Fills and Cuts established from Detailed Physical Site Survey
• Preparation of Engineering Specifications
• Preparation of Detailed Engineering Drawings for construction